JPDCL drive: 11 illegal connections disconnected

STATE TIMES NEWS

NOWSHERA: As per directions of Executive Engineer ED-Rajouri JPDCL and under supervision of AEE Electric Sub-Division Nowshera, a team led by AE along with concerned FM, MRs and filed staff conducted inspection/ disconnection drive in Nowshera town. During the drive, 11 Illegal connections were disconnected and 19 KW load was revised on the spot. AEE Nowshera has appealed to public for judicious use of electricity besides depositing electricity dues on time.

Comments (0)
Add Comment